The largest dam removal project in California at time of removal

After years of planning and three years of de-construction, the 95 year-old and 106 foot tall San Clemente Dam was removed on the Carmel River

The Timeline

1912

San Clemente Dam was constructed on the Carmel River to provide water supply for the Monterey Peninsula. It was 106 feet tall and had a reservoir storage capacity of approximately 1,425 acre-feet.Once constructed, the reservoir quickly filled with sediment. Toward the end of its life, the reservoir was filled by more than 2.5 million cubic yards of sediment, leaving a storage capacity of only 70 acre-feet, or 5% of what it was built for. The dam no longer served a useful purpose.

1991

Dam declared seismically unsafe by state inspectors from California Department of Water Resources Division of Safety of Dams

1997

NOAA Fisheries first designates the South Central Coast Steelhead as a threatened species and then again in 2006

1999

Carmel River listed as one of North America’s 10 most endangered rivers (American Rivers)

2005

NOAA Fisheries designates the Carmel River as critical habitat for South Central Coast Steelhead

2006

Environmental studies prepared offering several alternatives for bringing the dam into compliance with safety standards (including removing it, buttressing it, and cutting it down partway)

2007

Additional studies confirm feasibility of dam removal option

2009

Dam removal and river re-route option chosen

The Problem

Strengthening the dam was the least costly option. But that would not address the impact the dam had on steelhead trying to access 25 miles of upstream habitat nor the impacts of the dam blocking sediment to flow downstream and to the Carmel River beach. Partners came together to develop the concept of removing the San Clemente Dam into a feasible option.

The Plan

The project involved:​
1. Plugging sediment trapped behind the dam in place (as removing it was infeasible)
2. Re-routing the river to connect with the adjacent San Clemente Creek, and finally...​
3. Removing the dam

2011

Preliminary designs completed and project approval received from California Public Utilities Commission

2015

The dam was finally removed and the Carmel River was restored.

2016

Old Carmel River Dam removed

2017

Large flood reorganizes river channel

2019

127 steelhead counted at Los Padres Dam, five miles upstream

A River Re-Wilding

Now the Carmel River is free-flowing and the transformation of the Carmel River will continue as the river “re-wilds” itself.

Public Access Planning

Removing the San Clemente Dam and restoring the river was the first phase of this groundbreaking project. The next phase is to enable the public to access and experience the beautiful re-wilded Carmel River at this site, sharing the story of its transformation.

California American Water intends to transfer approximately 920 acres of the site to the U.S. Bureau of Land Management, which would be managed by Monterey Peninsula Regional Park District (MPRPD) for public access and connect MPRPD’s Garland Regional Park and San Clemente Open Space.

Because of the site’s remote location, access will be a back-country experience requiring a significant hike, bike, or horseback ride. Once reached, the site holds numerous opportunities:

- Public recreation along 3 miles of the Carmel River with potential for adding 5 miles more.

- Sharing the dam removal’s story of hope and transformation and the ongoing evolution of the river as it recovers.

- Potential to link together Garland Ranch Regional Park and San Clemente Open Space.

- Future potential to connect trails to nearby campsites in Los Padres National Forest’s Ventana Wilderness.


Next Steps

A community planning process is needed to evaluate access options, address community desires and concerns, and develop short- and long-term solutions. Contact the Coastal Conservancy (Trish Chapman, trish.chapman@scc.ca.gov) to stay informed of the next steps of the planning process.